Effingham, Illinois
Summer, 2008
Challenge
This project was on an expedited schedule with multiple contractors
on the job site. The multi-phase project required approximately
100,000 square yards of site preparation work on very unstable
soil with excessive moisture content.
Solutions
Soil was modified and dried by using lime kiln dust. The multi-phase
project was planned to accommodate the general contractor
and concrete paving crews’ schedules. Pre-job and project
planning meetings with all contractors kept the project on
schedule.
Construction Phasing
Phase 1: Pre-pulverization for dry down.
Phase 1—4: Soil processing 6 to10
thousand square yards per day as site was prepared prior to
placement of concrete paving.
Results
- Dry and stable sub-grade for building construction and
paving operations.
- Project completed on time.
- Exceeded expectation of general contractor and paving
subcontractor for stability and grade control.