Livingston County FDR Project
This clip shows the entire process of Full Depth
Recycling with engineered emulsion. First, two reclaimers
inject asphalt emulsion into the road at a depth of 8 inches
and mix the material. Then, padfoot rollers compact the material
until they are "walking out" of the mix. Next, the
motor grader takes the padfoot marks out of the pavement and
sets final grade and slope. The mixture is then finished with
a 25 ton rubber tire roller and a steel wheel roller in static
mode. The final product is a structurally enhanced pavement
with great flexibility to handle freeze thaw cycles. |